Today the electricity company came to renew a piece of the electric cabel because we wanted 3 phases instead of 1 to power all the new appliances in out new to be kitchen. The old cable did not want to give up so easily, the cable was stuck and they had to pul it out with a rope and a small excavator. Even after the cable was gone, problems still surprised us as the new cable did not fit the hole... Dad went to get a huge drill (rented for 5 euro) of a meter long and drilled out the hole in the basement. After that it was a piece of cake, connect the wires, put back all the clay in the pit and connect a 380 3 phase female socket for the builders. So now they won't have to start up the huge generator anymore to operate the crain. The floor beams of the attick are now in place and it will be soon that they will start to open the roof... Let's hope the weather cooprates..